CONTACT US

Our Address

Science Avenue, High-tech Zone, Zhengzhou City, Henan Province, China

  • How much steel is required for a 1000 square foot

    Let's Solve. We know 1sq.ft=0.092 Sq.m Therefore 1000sq.ft=92.9sq.m For RCC Slab we know Required Steel per cum in % (0.8%-1%) The Density of Steel =7850kg/m3 ...

  • How many bags of cement are required for 1 square meter of ...How much cement is required for 1600 sq ft?How much steel and cement is required for a 1000 sq ft RCC ...I want to build a 1000 sq. ft building. How much stone ...查看更多结果
  • How many steel is require in one sqft area?

    It depends upon the height of the building. If the structure is G + 3 the steel consumption is about 2.5 kg per sq.ft. If the structure is tower of 15 storeys the steel consumption can be as high as 6 kg per sq.ft. For towers which are 25 storeys high steel consumption is 7.5 kg per sq.ft.

  • how much steel required for 1 sq.m area?

    As per thumb rule steel requirement per sqft for residential buildings is 4-4.5Kg/Sqft. So just convert it into sqm. ... for high rise building,the qnty of steel in superstructure (incld column,Beam,slab)is about 48.00kg per SQM. Is This Answer Correct ? 7 Yes : 2 No : how much steel required for 1 sq.m area?..

  • Raw Material Calculator for Construction - Jklakshmi

    *Assumptions: 1. Load bearing brick wall thickness of 23cm (9 inches) in cement mortar 1:6 2. Plaster in cement mortar 1:4 Note: We recommend JK Lakshmi RMC to save time and cost.

  • how much steel required for 1 square meter slab?

    how much steel required for 1 square meter slab?.. Answer / s.nagabhushana rao Normally steel required for the slab is designed based on the type of slab the load factors.Normally for thumb rule at site we take as 15 kg / sq mtr.

  • Quantity Of Cement, Sand, Aggregates For 1000 sq

    Quantity Of Cement, Sand, Aggregates For 1000 sq ft Slab? To calculate the quantity of cement, sand, and aggregates required for a flat slab first we need to calculate the volume. Area of flat slab = 1000 sq.ft =93 sq. m. The minimum thickness provided for slab is 150mm .( According to IS 456) []

  • Number of cement bags required for concreting 1000

    assume for M20 grade of 350kg cement for 1cum of concrete is first convert the 4" thk to feet i,e 4/12= 0.333' then, 1000x0.333= 333cft convert 333cft to cmt i e, 333/35.28=9.438 for 9.438cmt of concrete cement required is 9.438x350=3303.3kg then convert it in to bags 3303.3/50=66.066bags so the cement reqired is 66.066bags.

  • Average House Construction Cost Philippines –

    A lot of people were asking how much is the average construction cost of a house and we see that the internet does not give exact answer to this concern. If you are one of the non-technical person who wants bulls eye answer, then you are reading the right article. The sample floor plan below

  • cement consumption per square feet in multi

    cement consumption per square feet in multi storeyed building. ALLInterview. Categories ... Cement consumption for building is 0.5 per sq.ft. and for multistoryed building it Will be 0.65 per sq.ft. ... what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.

  • 30x40 Site Material Construction Cost 1200 Sq ft

    Know how much does it cost to build a duplex house in 30 x 40 site. And also learn how many bags of cement, tmt steel, bricks/ blocks and jelly stones is required to build to home in 1200 square feet.

  • Calculator - AfriSam

    We also offer a hassle-free drymixed plaster, PLASTERPRO in a 25kg bag = 1m 2 plaster coverage at 15mm thick. Only available in Gauteng. Enquire on 0860

  • What is the quantity of cement required for 100 sq.m ...

    thickness 4cm 0 04m volume of wet concrete is1 54 to1 57 ratio of mix1 2 4 volume 1 2 4 7 unit weight of cement bag is1440 kg cum one bag of cement 50

  • Thumb rule of formwork quantity for High rise buildings.

    As per the data the calulation goes like for 1 Cum Concrete the requirement of shuttering is 11.71813333 Sqm On concretable area for 1 Cum Concrete the requirement of shuttering is 3.767038414 Sqm On floor plate area Shuttering required for 1 Sqm on BUA 3.110701842 Sqm On BUA Concrete Coefficient / Sqm 3.767038414 Posted: 1824 days ago

  • LOADS ON BUILDINGS AND STRUCTURES

    2017-9-29  Cement plaster, 13 mm thick Suspended metal lath and plaster (two faced incl. studding) Miscellaneous Felt (insulating), per 10 mm thickness Plaster ‐‐‐ cement, per 10 mm thickness lime, per 10 mm thickness PVC sheet, per 10 mm thickness

  • Rough Calculation for manpower requirement

    2020-6-15  I am Pranav Patil, recently I have faced one interview. They asked me to calculate manpower required for a building RCC work whereas building has 4000 Sqm built up area for each floor. Total floors are 30 Nos. Scheduled completion is 15 Month. I calculated manpower requirement as follows. Please suggest me if I wrong. Total Nos. of floors - 30 Nos.

  • Calculate how many concrete blocks are needed to

    Building Materials. Cement. 43 Grade Cement; 53 Grade Cement; Portland Pozzolana Cement; Concrete Cement; Portland Slag Cement; Ready Mix Concrete. M20 RMC; M25 RMC; M30 RMC; M35 RMC; TMT Steel Bars. Fe-500 TMT Steel Bars; Fe-500 D TMT Bars; Fe-550 TMT Bars; Fe-550 D TMT Bars; Fe-600 TMT Steel Bars; TMT Consumables. TMT Binding Wires; Concrete ...

  • How to Estimate the Cost of a Steel Superstructure for a ...

    2018-4-1  The installed unit rate per ton on a 400 ton project will cost less than the installed unit rate per ton on a 50 ton project. Geographical Location Regional differences in materials, labor and equipment can all have an impact on overall costs. For example, wage rates for labor in New York, NY will tend to be much higher than in Tampa, FL. There can

  • How to Calculate Cement, Sand and Aggregate

    2020-7-6  The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose

  • how much cement is required for 100 sq wall for

    how much cement is required for 100 sq wall for plastering and brick work. - Hi,how much cement is required for 100 sq wall for plastering and brick work. also how much number of 1st class brick is required for same 100 sq f wall area.Is there really any difference between local and company like tata jindal steel we used for RCC , Beam .what option is good in case of steel purchasing.Thanks .....

  • cement and steel requirement for sft -

    steel cement sand need for 100 sqft , how much cement is required for 100 sft plastering of ratio 1:4 Consider,plastering ( Cement and sand)thickness = 10mm Hence for 100 Sqft area,and 10mm thick plastering the what is shear key and steel schedule? , Cement, Steel, Sand to be dearer home, 'dear' home having a floor area of 900 sqft, would .

  • How to Calculate Cement, Sand and Aggregate

    2020-7-6  The proportions of cement, sand, coarse aggregate and water plays an important role in determining the fresh and hardended properties of concrete. So care should be taken while calculating the amount of Cement, Sand and Aggregate required for 1 Cubic meter of Concrete. Method-1: DLBD method to determine material requirement for 1 Cum concrete The DLBD (Dry Loose

  • how much cement is required for 100 sq wall for

    how much cement is required for 100 sq wall for plastering and brick work. - Hi,how much cement is required for 100 sq wall for plastering and brick work. also how much number of 1st class brick is required for same 100 sq f wall area.Is there really any difference between local and company like tata jindal steel we used for RCC , Beam .what option is good in case of steel purchasing.Thanks .....

  • cement and steel requirement for sft -

    steel cement sand need for 100 sqft , how much cement is required for 100 sft plastering of ratio 1:4 Consider,plastering ( Cement and sand)thickness = 10mm Hence for 100 Sqft area,and 10mm thick plastering the what is shear key and steel schedule? , Cement, Steel, Sand to be dearer home, 'dear' home having a floor area of 900 sqft, would .

  • Building Sand and Cement Calculator - Brick Warehouse

    Building Sand and Cement Calculator. How much sand and cement do I need to build a wall? Simply type in the height and length of a wall that you want to build and click on Calculate at the bottom, we will work out how much sand and cement that you need on the right of this page.

  • Prefabricated Steel Structure Building Applicable To ...

    Prefabricated Steel Structure Building Applicable To Office,School,Shopping Mall,Amusement Center,Exhibition Hall , Find Complete Details about Prefabricated Steel Structure Building Applicable To Office,School,Shopping Mall,Amusement Center,Exhibition Hall,Steel Structure Office,Prefabricated Steel Structure School,Prefabricated Cement Warehouse from Warehouses Supplier or Manufacturer ...

  • How much will your building cost to construct in

    How much a building will cost to construct usually depends on very many factors like the type of building, its location, specification of materials, wall to floor ratio, floor to ceiling heights, site topography, types of joinery and fittings, and quality of electrical and mechanical installations.

  • Tile Flooring Cost Estimation - Explanation with Online ...

    2020-6-20  Wet Volume of the cement mortar required = 0.6 m 3. We need 1.5 m 3 volume of wet cement mortar that means, we need this much volume after adding water to cement and sand mix. Dry volume of mortar is considered as 25% of more of wet volume. Related: Cement Mortar Calculation for Plastering. In order to calculate the dry volume,

  • Building Materials Calculator Estimation and Costing

    Easily calculate the exact quantity of online construction material required for your house or project construction by using free building material calculator. Brick calculator, concrete calculator, wood calculator, raw materials and many more.

  • steel cement sand need for 100 sqft - Nivelles

    how much cement is required for 100 sq wall for plastering ... how much cement is required for 100 sq wall for plastering and brick work. - Hi,how much cement is required for 100 sq wall for plastering and brick work. also how much number of 1st class brick is required for same 100 sq f wall area.Is there really any difference between local and company like tata jindal steel we used for RCC ...

  • COMPARATIVE STUDY OF PRE-ENGINEERED BUILDING

    2017-10-3  The market potential of PEB’s is 1.2 million tons per annum. The current pre-engineered steel building manufacturing capacity is 0.35 million tons per annum. The industry is growing at the compound rate of 25 to 30 %. 1.1 Classification of buildings 1.2.1 Reinforced Cement Concrete Buildings:

  • COMPARATIVE STUDY OF PRE-ENGINEERED BUILDING

    2017-10-3  The market potential of PEB’s is 1.2 million tons per annum. The current pre-engineered steel building manufacturing capacity is 0.35 million tons per annum. The industry is growing at the compound rate of 25 to 30 %. 1.1 Classification of buildings 1.2.1 Reinforced Cement Concrete Buildings:

  • For one meter cube of concrete how much kg steel is ...

    For example, according to SP (Russian norms for Nonprestressed Concrete Structures) minimum reinforcement area should be determined Asmin = mus * b * h0, where Asmin - is the minimum area of reinforcing steel within the tensile zone, mus - is the minimum reinforcement ratio, for bending mus =0.001, for bending with axial force mus =0.0025, b ...

  • Mortar Estimator - Cashbuild

    This calculator estimates the quantities of sand and Ordinary Portland Cement for Class II (Non-Structural) mortar per square metre of brickwork. Please enter the

  • requirement of steel reinforcement per cum of rcc work

    As per thumb rule steel requirement per sqft for residential buildings is 4-4.5Kg/Sqft. So just convert it into sqm. how much steel required for 1 sq.m area? - ALLInterview. how much steel required for 1 sq.m area? ALLInterview. Categories . Hi Generally Per Cum. of concrete 75kg-110kg steel is required. if you are asking for residential it may ...

  • Raw Material Calculator for Construction - Jklakshmi

    *Assumptions: 1. Load bearing brick wall thickness of 23cm (9 inches) in cement mortar 1:6 2. Plaster in cement mortar 1:4 Note: We recommend JK Lakshmi RMC to save time and cost.

  • BrickWork Calculation Calculator Quantity of Sand ...

    2020-7-6  BrickWork Calculation best automatic calculator to find quantity of bricks with or without mortar and you can also add thickness of RCC bed if required in calculation. Types of Bricks, How to calculate the no. of bricks required for 1 cubic meter, No. of bricks required in a wall.

  • price per square meter of steel sheet metal roof, price ...

    Alibaba offers 1,035 price per square meter of steel sheet metal roof products. About 3% of these are Roof Tiles, 1% are Sandwich Panels, and 2% are Metal Building Materials. A wide variety of price per square meter of steel sheet metal roof options are available to you, such as project solution capability, warranty, and technique.

  • (PDF) Green Building Materials for Indian Cost

    building materials are calculated as cement, sand, aggregates, steel, bricks on per sqm of plinth area basis, which require the almost all the energy in Construction of the house. The components ...

  • Labor Requirement for Various Construction Works -

    2020-7-4  The cost of construction project highly depends on the requirements of labor for various activities during construction. There are direct and indirect costs associated with the labor. They are the salary of labors, their accommodation, food, insurance cost etc. Thus it is essential to understand the number labors required for each activity of the construction [hellip;]

  • Minimum Standards for Structural Design RCC

    Minimum size of foundation for a single storey of G+1 building, where soil safe bearing capacity is 30 tonnes per square meter, and the oncoming load on the column does not exceed 30 tonnes, a size of 1m x 1m should be used. Minimum depth of footing should be atleast 4′ below ground level.